Measure the depth you will place. A live lawn wants a fraction of an inch. A raised bed wants the inside height you will fill.

Allowance for settling and an uneven bottom. Ten percent orders 1.10 times the measured volume.

Loose moist topsoil is near the weight of loam. The Engineering Toolbox lists loam at 80 pounds per cubic foot and loose moist dirt at 78. A wet yard load can be heavier.

Price, optional

Each price is its own estimate for this order. Delivery and tax are separate. Prices stay in US selling units: cubic yards, short tons, and bags.

Results update as you type. The measurements start as a worked example.

Results

About 1.3 cubic yards of screened topsoil: 35.2 cubic feet, or 1.41 short tons.

Cubic yards
1.3
Cubic feet
35.2
Short tons
1.41
Square feet
32
Cubic meters
0.997
Metric tonnes
1.277
1 cu ft bags
36
0.75 cu ft bags
47
40 lb bags
71

Before the 10% allowance: 1.19 cubic yards (32 cubic feet).

Cubic-foot bags are counted from the volume. A 40 pound bag count divides the order weight by 40, so it changes if you edit the density. If a bag prints a volume, prefer that count.

Material cost

Add a price per cubic yard, short ton, or bag to estimate material cost.

Working

  1. Area = 8 ft × 4 ft = 32 sq ft.
  2. Depth = 12 in ÷ 12 = 1 ft.
  3. Net volume = 32 sq ft × (12 ÷ 12) ft = 32 cu ft (1.19 cu yd).
  4. Allowance = 10%, so order volume = 32 cu ft × 1.1 = 35.2 cu ft (1.3 cu yd).
  5. Density = 80 lb/cu ft (1,281 kg/cu m), or 1.08 short tons per cubic yard.
  6. Weight = 35.2 cu ft × 80 lb/cu ft ÷ 2,000 = 1.41 short tons (1.277 metric tonnes).
  7. 1 cu ft bags: 35.2 ÷ 1 = 35.2, so order 36 bags.
  8. 0.75 cu ft bags: 35.2 ÷ 0.75 = 46.93, so order 47 bags.
  9. 40 lb bags: 2,816 lb ÷ 40 lb = 70.4, so order 71 bags.
  10. Metric equivalent: 0.997 cubic meters.

Formulas, densities, and sources

How much topsoil do I need?

Multiply the area in square feet by the depth in inches and divide by 324 to get cubic yards. One cubic yard is 27 cubic feet. At the screened topsoil preset, that yard weighs about 1.08 short tons. Volume bags follow cubic feet, and a 40 pound count follows the density.

How do I use this topsoil calculator?

  1. Enter the inside length and width of the bed, or the lawn area you will cover.
  2. Enter the depth you will actually place. A live lawn wants a fraction of an inch, not a garden-bed depth.
  3. Keep or change the 10 percent settling allowance, and edit the density if the supplier printed one.

How deep should the soil be?

Soil for 100 square feet at common depths, before settling
JobCubic yards
Lawn topdressing, 1/4 inch0.08
Lawn topdressing, 1/2 inch0.15
New bed, 6 inches1.85
Raised bed, 12 inches3.7

How do tons and bags follow from the yards?

Screened topsoil starts at 80 pounds per cubic foot, in line with the Engineering Toolbox figures for loam (80) and loose moist dirt (78). A cubic yard at that density weighs1.08 short tons. Garden mixes with compost are lighter. Wet yard loads run heavier, sometimes toward 100 pounds per cubic foot. Edit the density when the supplier has a number, especially if you are checking a truck’s payload.

A full-size pickup often has room for the volume of a yard or two and not for the weight. Two cubic yards of this topsoil is a bit over two short tons, before the people and the fuel in the truck. Read the payload sticker on the driver’s door and leave a margin.

Bag math splits in two. A 1 cubic foot bag count is the cubic feet of the order. A 0.75 cubic foot bag is the same volume divided by 0.75. A 40 pound bag is the order weight divided by 40, which is only as good as the density. Many bags print both a weight and a volume. Use the printed volume when it is there.

What does the example in the form come out to?

A 4 by 8 foot bed filled12 inches is 32 square feet times 1 foot, or 32 cubic feet. That is1.19 cubic yards before settling. The10 percent allowance makes the order35.2 cubic feet, or1.3 cubic yards, and1.41 short tons at 80 pounds per cubic foot.

Soil delivered in a truck is loose. After you water it, the surface drops. The allowance is that drop plus a bit for a bed bottom that is not perfectly flat. If you are filling to the top of the boards and want it to stay there, the allowance belongs in the order. If you measured a hole that is already the finished depth you want, you still want a little extra, because the soil you put back is fluffier than the soil you dug out.

What are the common questions?

How much topsoil do I need?

Multiply the area in square feet by the depth in inches and divide by 324 to get cubic yards. An 8 by 4 foot raised bed filled 12 inches deep is 32 cubic feet, about 1.19 cubic yards, before a settling allowance.

How many yards of topsoil does a lawn need?

Topdressing a live lawn is a thin layer, about 1/4 to 1/2 inch, so you do not bury the grass crowns. A new planting area is several inches deep. Enter the depth you will actually place. A garden-bed depth on an existing lawn will smother it.

How much does a cubic yard of topsoil weigh?

At the screened-topsoil preset of 80 pounds per cubic foot, a cubic yard weighs 1.08 short tons, or 2,160 pounds. The Engineering Toolbox lists loam at 80 pounds per cubic foot and loose dry dirt at 76. Wet loads and clay weigh more. Check the payload sticker on the truck before you fill the bed.

How many bags of soil are in a cubic yard?

Twenty-seven bags of 1 cubic foot, or 36 bags of 0.75 cubic foot. A 40 pound bag count depends on density. At 80 pounds per cubic foot, a 40 pound bag is half a cubic foot, so a cubic yard is 54 of those bags. If the bag prints a volume, use the volume count.

Should I order extra soil for settling?

Soil settles after it is watered, and the bottom of a bed is rarely flat. Ten percent is a modest allowance for that. It is included in the raised-bed example. It does not replace measuring the inside length, width, and the height you will actually fill.

What does this calculator refuse to decide?

It estimates quantity only. Depth, compaction, and whether a load will fit a truck stay with you or your supplier.

  • Results are ordering estimates from the formulas on this page. They are not a driveway design, a drainage plan, or a planting specification.
  • The allowance is a percent you choose. It is not a measured waste total for a particular job.
  • Preset densities are planning figures. A wet load can weigh more. Use the supplier figure when you have one.
  • Bag and pallet counts round up. They are not a promise that a yard or a farm will split a unit.
  • Prices are material estimates from the numbers you type. Delivery, tax, and labor are separate.

The disclaimer states the same limit for every calculator. Check the order with your supplier before you buy.