Last updated November 16, 2026.
Area
- Rectangle: length × width.
- Circle: π × (diameter ÷ 2)². The field asks for the diameter because that is the distance across.
- Triangle: ½ × base × height, with height measured square to the base.
US lengths are in feet. Metric lengths are in meters and are converted with the international foot, exactly 0.3048 meters. One square meter is10.7639 square feet.
Volume
Depth in inches is divided by 12 to get feet. Depth in centimeters is divided by 100 to get meters. Volume is area times that depth.
- 1 cubic yard = 27 cubic feet.
- 1 inch of depth over 1 square foot is 1/12 cubic foot.
- One cubic yard spread 1 inch deep covers 324 square feet, because 27 × 12 = 324. Coverage at any depth is 324 ÷ depth in inches.
- 1 inch = 2.54 centimeters, exactly.
Cubic meters are converted from cubic feet with the cube of 0.3048. The metric toggle changes the fields you type into. Yards, short tons, and US bag sizes stay in the result because that is how the material is sold here.
Allowance
The allowance is a percent added to the net volume or area. Ten percent multiplies the result by 1.10. It is capped at 100 percent. Zero is allowed.
For decorative gravel and for mulch, treat it as waste: spillage, odd edges, and a thin spot. For crusher run, decomposed granite, and other base that will be compacted, the finished thickness is less than the loose thickness, so the allowance is doing more work. It is not a Proctor compaction test. If a specification calls for a compacted depth, ask how much loose material that depth requires.
Soil uses the same multiplier for settling after watering. Sod uses it for pieces cut off along edges and curves. Mulch does not need a compaction factor.
Weight
Short tons = cubic feet × pounds per cubic foot ÷ 2,000. A short ton is 2,000 pounds. A metric tonne is 1,000 kilograms. The pound used in the conversion is the international avoirdupois pound, exactly 0.45359237 kilograms. Metric tonnes in the result are that conversion of the pound weight, not a second density.
Tons per cubic yard = pounds per cubic foot × 27 ÷ 2,000. At 100 pounds per cubic foot, a cubic yard is exactly 1.35 short tons. At about 74 pounds per cubic foot, a cubic yard and a short ton are the same weight. Ordinary gravel and topsoil are heavier than that, which is why a ton and a yard are different orders.
Bags, pallets, and money
A volume bag count is ordered cubic feet divided by the bag’s cubic feet. A weight bag count is ordered pounds divided by the bag’s pounds. Pallet and roll counts are ordered square feet divided by the size you enter. Anything that is not already a whole number rounds up to the next whole bag, pallet, or roll, because that is what you have to buy. Exact values are shown in the working so you can see how much the rounding added.
A price per cubic yard is multiplied by ordered yards. A price per short ton is multiplied by ordered tons. A price per bag is multiplied by the rounded-up bag count. A sod price per square foot uses the order area, and a price per pallet uses whole pallets. Each price is a separate estimate. Delivery, tax, fabric, edging, and labor are not included. Displayed money is rounded to the cent.
Densities
Bulk density changes with moisture, particle size, and how tightly the load is packed. The presets are loose planning figures. They are not a lab report for the pile on a particular truck. The Engineering Toolbox table fordirt and mud densitieslists gravel at 105 pounds per cubic foot dry and 125 wet, sand at 97 dry and 119 wet, loam at 80, loose dry dirt at 76, and loose moist dirt at 78. Itscommon-products tablelists bark and wood refuse at 10 to 20 pounds per cubic foot. Kilograms per cubic meter on this site are converted from the pound figure, so they can differ by a rounding step from a table that prints both units.
| Material | lb/cu ft | tons/cu yd | kg/cu m | Published range |
|---|---|---|---|---|
| Pea gravel Midpoint of the range landscape suppliers usually quote for loose pea gravel. A generic dry-gravel reference value is a little higher (105 lb/cu ft). | 100 | 1.35 | 1,602 | 93–104 lb/cu ft |
| Crushed stone Engineering Toolbox dirt-and-mud density table: gravel, dry, 105 lb/cu ft (1,680 kg/m³, their rounded metric figure). | 105 | 1.42 | 1,682 | 105 lb/cu ft dry; about 125 wet |
| River rock Same planning band as pea gravel. Very large rock can land lighter per cubic foot because of the voids, which is why the density stays editable. | 100 | 1.35 | 1,602 | about 93–104 lb/cu ft |
| Crusher run Planning midpoint for dense-graded base. It compacts more than clean crushed stone, so the allowance matters as much as the density. | 110 | 1.49 | 1,762 | about 100–125 lb/cu ft |
| Decomposed granite Planning figure aligned with dry gravel. Finished depth after tamping is less than the loose depth you order. | 105 | 1.42 | 1,682 | about 100–115 lb/cu ft loose |
| Lava rock Midpoint of the range commonly printed for landscape lava rock. A ton covers much more ground than a ton of crushed stone. | 50 | 0.68 | 801 | about 40–55 lb/cu ft |
| Material | lb/cu ft | tons/cu yd | kg/cu m | Published range |
|---|---|---|---|---|
| Shredded hardwood Planning midpoint of the usual bulk-mulch band, about 600 pounds per cubic yard. Bark and wood refuse in published tables is often lighter, around 10 to 20 lb/cu ft. | 22 | 0.3 | 352 | about 15–30 lb/cu ft |
| Bark nuggets Inside the Engineering Toolbox range for bark and wood refuse (10 to 20 lb/cu ft). Volume, not weight, is how nuggets are ordered. | 15 | 0.2 | 240 | about 10–20 lb/cu ft |
| Wood chips Planning figure inside the common chip-mulch band. Order chips by the cubic yard. | 18 | 0.24 | 288 | about 15–30 lb/cu ft |
| Material | lb/cu ft | tons/cu yd | kg/cu m | Published range |
|---|---|---|---|---|
| Screened topsoil Engineering Toolbox: loam 80 lb/cu ft, loose moist dirt 78 lb/cu ft, loose dry dirt 76 lb/cu ft. Wet delivered topsoil is often quoted up to about 100 lb/cu ft. | 80 | 1.08 | 1,281 | about 76–100 lb/cu ft |
| Garden soil blend Planning midpoint between a compost-heavy blend and mineral topsoil. Use the supplier’s weight when the mix is sold by the ton. | 65 | 0.88 | 1,041 | about 50–80 lb/cu ft |
| Fill dirt Engineering Toolbox: dirt, loose dry, 76 lb/cu ft. Moist or clayey fill weighs more. | 76 | 1.03 | 1,217 | 76 lb/cu ft loose dry; heavier when moist |
Pea gravel, river rock, crusher run, decomposed granite, lava rock, and the mulch weights are planning midpoints of ranges suppliers and reference tables commonly quote. They are labeled that way in the basis column. Crushed stone uses the Engineering Toolbox dry-gravel figure directly. Screened topsoil uses the loam figure. Fill dirt uses loose dry dirt. When a supplier has tested a product, the test often follows a loose bulk-density method such as ASTM C29. This site has not run those tests.
Mulch depth
The depth guidance on the mulch calculator follows extension publications, not a density table.Penn State Extensionrecommends 2 to 4 inches of organic mulch, less on poorly drained soil and with fine shredded mulch, kept off the root flare.Iowa State University Extensionsuggests 3 to 4 inches of wood chips or shredded bark on well-drained sites and 2 to 3 inches on heavy soil, kept at least 6 inches off the trunk.University of Illinois ExtensionandWisconsin Horticulturegive the same 2 to 4 inch band and the same warning against mulch piled on the bark.
Sod sizes
A pallet of about 450 square feet, in rolls of about 10 square feet, is a common US sales unit. It is not a standard you can look up the way you can look up the foot. Farms also sell 400 and 500 square foot pallets and smaller slabs. Both sizes are fields in the calculator for that reason. The default 5 percent waste allowance is a planning figure for ordinary edge cuts on a rectangle. Curved layouts waste more.
Rounding and what the tools will not do
Displayed areas, yards, and short tons are rounded for reading. The bag, pallet, and roll counts use the full value and then round up. Two calculators that you add together by hand should be added from the cubic yards or square feet, not from already-rounded bag counts.
These tools estimate material for an order. They do not design a driveway section, a drainage system, a retaining wall, or a soil specification. They do not know how wet tomorrow’s load will be. For a structural base, a drainage trench, or a large grade change, use the contractor’s or engineer’s depth and the supplier’s density, and treat this page as the arithmetic.